Foundation Walls Complete
Monday, November 21st, 2005At this point the foundation walls are complete and the forms have been removed. Here are a couple pictures from this past weekend right after the forms were taken off. Note: Click on any image to see a larger view.
Looking from the side yard at the garage end. 2 car garage is nearest (with large pile of dirt in the middle), then lower level is basement.
Looking from the rear of the house at the garage end. You can see the walkout basement opening as well as an opening for a window in the rear wall of the basement.
From the same side again, but now looking to across the front of the house. If you look closely (click on the image for a larger view) you can see the lake through the trees just past the far side wall of the house.
View from the street. The gravel shows where the driveway will go up into the 2 car garage on the left. From the corner of the garage to the wall that juts out towards the street (the living room) there will be a front porch and the front door will be at the right end of the porch.
Thanks again, Chris, for the great pictures!